Earthworks

Rosenlund Contracting’s capabilities encompass; BULK EARTHWORKS, DEMOLITION, and EXCAVATIONS. TENNYSON POWERSTATION, BLOOD BANK, CORONATION DRIVE OFFICE PARK 4 are among OUR more high profile projects of recent years.

Some of the larger civil projects completed recently include Milton Office Park IV. This project was valued in excess of $6 million and involved the installation of the retention system; piling, anchors, sprayed concrete, direct as an “early works” package for the client. The excavations were in all types of materials (volume 40,000 tonnes) including rock and acid sulfates. Rosenlund also performed the decontamination of the site, heavy metals etc removal. It was one of Brisbane’s most difficult sites.

Further, Rosenlund recently performed the excavation for Thiess Contractors for a new (green star rating of five) building in George Street Brisbane City. The excavation involved the removal of approximately 40,000m3 of material.

Our PLANT HIRE FLEET has late model machinery, maintained in fully equipped ENGINEERING WORKSHOPS, all log books are up-to-date. We have fully qualified DIESEL FITTERS, BOILERMAKERS and TA’s, who can readily manufacture necessary hardware, when such equipment is almost impossible to procure off the shelf.

We’re QUALITY ASSURED to AS/NZS ISO-9002/1994. We hold QSBA Gold Card #074392 for Demolition, General Building and Drainage. We have affiliations with the Civil Contractors Federation and the Asbestos Association of Australia. We are a Queensland Government preferred supplier holding a PQC3 status that very few contractors will ever attain.

Rock Hammering at Tennyson Power Station